Completed: 2016 Commercial wood framing project in Crescent City, Calif. Consisted of building a new Science Laboratory and involved a full time State inspector who observed all aspects of construction while it was occurring. As … Read More
Party City
Completed: 2014 Negotiated Contract, included design, engineering, and permit approvals. Design involved solution for “structural, fire stop, demising wall” that was intended to be removed to accommodate the space requirements. Fire sprinklers had to be … Read More
Buffalo Wild Wings
Completed: 2015 Contracted for rough carpentry of this wood/metal framed hybrid structure. Coordinated with multiple other trades for a successful on time delivery
Food Maxx Facade
Completed: 2015 Contracted for demo and rough carpentry. Remove existing entry structure – Construct new, modern tower and entry feature
Panda Express – Oroville
Completed: 2016 Contracted for rough carpentry. Fast paced project with a 3 week turnaround.
Panda Express – Susanville
Completed: 2015 Contracted for rough carpentry. This was a fast paced project while dealing with winter conditions
Panera Bread & The Noodle Company
Completed: 2015 Contracted for rough carpentry which features multiple layers of exterior wall build over and engineered lumber roof system
Steak ‘n Shake
Completed: 2016 Contracted for rough carpentry. Features multiple sloped signage walls and curving interior soffits.
Rexel
Completed: 2014 Commercial Tenant improvement. Negotiated Contract, included design and permit approvals. Modified and upgraded existing office area and bathrooms, new finishes, upgraded interior and exterior for ADA compliance.
Trinity Center, Water Treatment Plant
Completed: 2014 Provided and erected a metal building for a water treatment processing facility. Included design and engineering, 6-simultaneous roof hatch openings to access and service the water pumps through the openings directly over the … Read More