Completed: 2017 Had previously demo’d and prepped space for Hobby Lobby and their TI contractor who ran into trouble prior to final inspection with their newly completed concrete entry not meeting ADA compliance. We were … Read More
Quest Diagnostics
Completed: 2017 GBI performed the Tenant Improvements for 2-Quest Diagnostic Medical Labs, one in Oroville and another in Anderson, Calif. These involved preparing the tenant space for construction, making utility improvements as needed, providing the … Read More
Light Soda on Tap
Completed: 2018 Industrial tenant improvement project in San Francisco involving both interior and exterior improvements, required much assistance with design and permitting. Restaurant equipment business that remained operational while new warehouse and offices were modified … Read More
Abbey of New Clairvaux Phase II
Completed: 2018 After successfully completing rough/finish carpentry for Phase I, GBI was honored to be invited back to participate in Phase II. Scope of work included plan/engineering coordination, concrete foundation, layout, modify existing structures to … Read More
Abbey of New Clairvaux Phase I
Completed: 2018 Commercial wood framing project in Vina, Calif. Project is an extension of a very old stone abbey reassembled from its original location in Spain. The monks at New Clairvaux discovered their original chapel … Read More
Lavender Hills Assisted Living
Completed: 2016 Commercial wood framing project in Redding, Calif. Consisted of building a 12,000 sq ft Extended Care Facility. In this case the concrete subcontractor attempted pouring larger areas than capable resulting in a less … Read More
College of the Redwoods
Completed: 2016 Commercial wood framing project in Crescent City, Calif. Consisted of building a new Science Laboratory and involved a full time State inspector who observed all aspects of construction while it was occurring. As … Read More
Party City
Completed: 2014 Negotiated Contract, included design, engineering, and permit approvals. Design involved solution for “structural, fire stop, demising wall” that was intended to be removed to accommodate the space requirements. Fire sprinklers had to be … Read More
Buffalo Wild Wings
Completed: 2015 Contracted for rough carpentry of this wood/metal framed hybrid structure. Coordinated with multiple other trades for a successful on time delivery
Food Maxx Facade
Completed: 2015 Contracted for demo and rough carpentry. Remove existing entry structure – Construct new, modern tower and entry feature